/// PROJECTS
The development of floating offshore wind technologies is accelerating significantly but different technical, environmental, and industrial challenges remain to be addressed. With less than 0.25GW installed worldwide in 2024 and the commissioning of the first commercial projects starting from 2030, the sector is still emerging.
Currently, there is no test site in Europe capable of hosting floating wind turbines with a unit capacity greater than 10 MW. The aim of HiPoTeSis is to provide Europe with a coherent vision for testing high-power floating wind technologies, with the Atlantic region as the logical spearhead.
The objectives are to:
EAPA_0099/2024
Interreg Atlantic Area 2021-2027 / Call 3 / Priority 2 - Blue /Green environment. Specific Objective RSO2.1. Promoting energy efficiency and reducing greenhouse gas emissions
07/01/2025
12/31/2027
30
2.351.864,40 €
394.950,00 €
1.763.898,29 €
296.212,50 €
Fondation OPEN-C (FR)
OPEN-C (FR) - BiMEP (ES) - CEO (PT) - PLOCAN (ES) - NOW (NO) - SEAI (IE). Associated partners: CNR (IT) - PLEMCAT (ES) - EMEC (UK)